THE XBLOCS® PLANT STARTED PRODUCING

For the time being, the Design and Construction Joint Venture uses the first 1,400 Xblocs® of 4m3 made by the factory operating with concrete trucks and manual formwork and removal. Once this stock is completed, then first units manufactured by the prefabrication plant after several tests, are to be used. As a reminder, such 15,000 units will be necessary for Calais Port 2015 works.