PRODUCTION OF 6 M³ XBLOCS® HAS ALREADY STARTED

Production of 4 m3 Xblocs® stopped on 25th January 2016.
4,056 Xblocs® of 4 m³ were produced of which 1,436 in the factory located on the Hoverport site operating with concrete trucks and manual formwork and removal at the beginning of the works site, and the remainder in the automated manufacturing plant ; and 1,528 of these “small size” units were put on to the breakwater.

The manufacturing plant was transformed to produce 6 m³ Xblocs® ; worth noting that 4 m3 Xblocks® will still have to be manufactured later on for the construction site.