As announced and in accordance with Calais Port 2015 schedule, the Eastern inner embankment and the main breakwater are now joined, creating the R4 basin to be filled up with a new dredging campaign to start in March.
As announced and in accordance with Calais Port 2015 schedule, the Eastern inner embankment and the main breakwater are now joined, creating the R4 basin to be filled up with a new dredging campaign to start in March.