WORK PROGRESS OF ENGINEERING STRUCTURES

When driving through the port access, motorists have been seeing for several weeks an incessant ballet of cranes building engineering structures. As four of them have their foundations been completed, the VSOL© wall scales are now visible with their backfilling taking height and giving shape to constructions. As the first bridge deck is now poured, the earth-moving machinery can be used to build the future traffic lanes to pass over and under this bridge.